Adding New Plants

This section describes the procedure of adding plants.

Prerequisites

The user has the permission of adding plants.

The user has obtained the device serial number.

Procedure

1.Click “Add” to enter the corresponding interface.

2.Fill in the basic plant information.

Parameter Description
Plant name* Name of the plant
Plant abbreviation* Short name of the plant
Organization* Organization to which the plant belongs
Plant type* Type of the plant
Including ground plant, distributed PV, residential PV, village-level power plant, commercial ESS, poverty reduction power plant, wind plant, and residential energy storage
System solution* Type of the inverter used in the plant, including: “Central”, “String”, and “Combination”
Plant state* State of the plant
Including normal, stop operation, and connecting
Access method* Including Insight Pro upload, Logger, GPRS upload, third-party upload, WLAN upload, and Insight upload
Being built state* Construction status of the plant
Including “Under construction”, “Grid-connected (accessed), and “Proposed construction”
Longitude* Longitude of the plant
Latitude* Latitude of the plant
Plant address* Address of the plant
Owner Name of the owner
Operator Name of the operator
EPC Name of the engineering procurement construction
Start date of safe running* Date at which the plant starts to operate normally
Grid-conn. Date Time at which the plant starts feed-in operation
Country/Region Country/Region where the plant is located
Time zone* Time zone of the plant
Pnom* Rated power of the plant
SN* Serial number of the inverter
Owner’s email address The owner’s email address
Owner’s phone The owner’s mobile phone number
Panorama default selection* Display manner of the panorama
Including unit level and equipment level

Note: * indicates fields that must be filled in.

When the plant type is set to "Commercial ESS" or "Residential energy storage", the parameters, battery type and battery capacity, are settable.

The parameters, "Contact name" and "Panorama default selection" may be displayed or hided based on the specific plant type.

3.Optionally, click “+Exp.” to fill in more plant information

Parameter Description
Scheduling type* Scheduling manner of the plant
Including provincial dispatch, local distribution, and county-level dispatch
Asset property Property of the plant asset
Including state-owned enterprise, private operated enterprise, and combination
Construction date Date at which the plant starts to be constructed
Operation years Maximum operating time of the plant
Region category Type of solar resource area to which the power station belongs
Including class I resource, class II resource, and class III resource
PR upper limit* Maximum system efficiency
PR lower limit* Minimum system efficiency
PR supplement value* Supplementary system efficiency
PR factor* Factor of the system efficiency
Cost for per watt* Cost per watt
Cost recovery time* Time that it takes before the plant starts generating revenue
Grid-connection level Grid-connection level of the plat
Including 220V, 380V, 6KV, 10KV, 20KV, 35KV, 66KV, 110KV, 220KV, 330KV, 500KV, 750KV, and 1000kV
Plant description Related description of the plant

Note: * indicates fields that must be filled in.

4.Click “Confirm”.

文档更新时间: 2021-04-30 17:22   作者:admin