Cloud Strategies

  1. Click “Control Method -> Cloud Strategies” in the menu bar.

  2. Select the plant in the plant list on the left.

  3. Perform the following operations according to actual condition.

Production Plan

Production plan is used to judge the yield and the charge/discharge of a device, and the load change of electricity-consuming equipment, for PV maintenance, energy storage maintenance and load change.

Perform the following operations according to actual condition.

  • Click and select a date to view the production plan for the corresponding date.

  • Click “Add”, select “Device ID”, “Start Time” and “End Time”, and click “Save” to finish setting the production plan.

  • Click “Delete” to delete a production plan.

Tariff Scheme

View the tariff scheme uploaded by EMS300CP to the cloud. If you want to modify it, please scan the QR code below to view the EMS300CP user manual.

Load Forecast

It is used to predict the load curve according to the production plan.

Perform the following operations according to actual condition.

  • Click , select the date, and click “Query” to view the load curve of the corresponding date.

  • Click “Start to Forecast” to predict the load curve for that day.

  • Click “Export” to save the load curve to local.

Power Forecast

It is used to predict short-term power and ultra-short-term power.

Perform the following operations according to actual condition.

  • Click , select the date, and click “Query” to view the actual power, short-term power forecast and ultra-short-term power forecast for the corresponding date.
 Short-term power forecast range: Power yield of a PV plant from 0: 00 to 24: 00 in a day.
 Ultra-short-term power forecast range: Power yield in future 15 min ~ 4 h of a PV plant.
  • Click to switch between chart and list.

  • Click to select the content to be displayed.

  • Click to export the forecast power curve.

Scheduling Management

It is used to maintain and manage plans.

Click , select the date, and click “Query” to view the actual and planned values of charge and discharge power and SOC on the corresponding date.